14.8.3

Showing comments and forms 1 to 2 of 2

Support

Medway Local Plan (Regulation 19, 2025)

Representation ID: 4367

Received: 18/07/2025

Respondent: Mr Graham Hunt

Representation Summary:

I support this - providing the additional traffic does not have knock on problems on the approach to Junction 4 from Rainham/Parkwood and the flow of traffic on the M2. Ideally the M2 should be increased to 3 lane width between J4 and J5 if not to J7.

Object

Medway Local Plan (Regulation 19, 2025)

Representation ID: 4430

Received: 28/07/2025

Respondent: Mr Ray Dines

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

The delivery and viability of the proposed improvement at has not been proven. There is no approved design or realistic costing.
The large new allocations in the Capstone Valley have not been modelled in terms of there impact on the local highway network.