5.11
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 337
Received: 19/09/2023
Respondent: Catherine Waterman
Every inch of space is being taken up by housing already. We need to ensure Medway is fully supported first before reaching out to assist neighbouring boroughs. I believe in supporting your neighbours, but your own home has to be in order first!
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 360
Received: 26/09/2023
Respondent: Mrs Monira Ali
If there is capacity, gravesham council would need to support financially for costs towards need to more school, GPS, better roads/ better infrastructure, improved public transport, residential parking, the upkeep of maintaining the area where these 2000 homes may be built.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 380
Received: 02/10/2023
Respondent: Mr Nicholas Dowling
It is our view that accepting to allocate an extra 2000 homes onto top of the 19,000 homes that remain to be found within Medway is an unacceptable and unsustainable position to accept, given the existing clearly defined constraints that exist within the boundaries of Medway itself. Any proposal to accept Gravesend Borough Councils overspill would be contrary to the ambition to reduce pressure on local services and will not be supported.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 400
Received: 03/10/2023
Respondent: Mr Stephen Dyke
This additional 2,000 homes seems to have been underplayed in the consultation document - presumably these would be in the Strood area?
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 422
Received: 06/10/2023
Respondent: Mrs Jill Norton
Absolutely no way!!!
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 489
Received: 18/10/2023
Respondent: Mr Glen Cook
Medway does not "need" another 28500 homes. This is what is designated by people with a vested interest in creating a need for 28500 homes. Discuss.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 502
Received: 19/10/2023
Respondent: Mr Keith Swaden
Each of the site maps should show all developments close to the Medway border. Unless this is included, we do not get a full picture of the potential impact to residents as cross-border developments impact services on both sides. This one is specific to a request from Gravesham but there are others such as the 'Lidsing Garden Community’ on the border with Maidstone and the Medway Valley development across the Medway border with Wouldham, Burham and Eccles. Viewed in isolation, the Medway Plan does not give a true picture of potential developments affecting residents.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 530
Received: 20/10/2023
Respondent: Francesca Baylis
I do not agree with the council providing capacity for Gravesham.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 618
Received: 25/10/2023
Respondent: Mrs Daniela Baylis
This should not be considered. There are no benefits to Medway residents in providing housing for other authorities. There are enough potential problems in meeting our own housing requirements with associated infrastructure. In not considering providing these 2000 homes Medway will be able to protect its valuable green belt and other green spaces currently under consideration for development.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 679
Received: 26/10/2023
Respondent: Ms Catriona Jamieson
This should be a clear "no". Medway is more densely populated than Gravesham. Medway should work with Gravesham to challenge unrealistic housing targets and fight for the needs of their residents.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 797
Received: 27/10/2023
Respondent: AC Goatham & Son
Agent: Bloomfields Ltd
The level of housing need required for the Medway area identifies a requirement for 1,667 homes a year in Medway, which provides a total figure of around 28,500 homes to be delivered before the end of 2040. This figure could further be increased, as it is
identified in paragraph 5.11 that Medway are currently considering a request from Gravesham Borough Council to increase capacity by 2000 homes to help meet the housing need of their district.
The likelihood of Medway having to absorb some of this housing need should not be ignored in the early stages of Local Plan creation.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 832
Received: 27/10/2023
Respondent: Mr Brian McDonald
Don’t build on protected sites or green belt in open countryside. Countryside between Gravesham and Medway is both a green lung for the surrounding area and it’s most attractive feature- don’t spoil this for future generations.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 836
Received: 27/10/2023
Respondent: Mrs Patricia Sharp
Medway has a housing problem and cannot be responsible for a neighbouring borough. The provision of an extra 2000 homes would put additional pressure on our struggling doctor and hospital services and local schools and other services. Our hospital cannot currently cope with current number of residents and no provision seems to have been made for an additional hospital for the needs of Medway.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 855
Received: 28/10/2023
Respondent: Mr Keith Harrison
Is Gravesham's request based on unrealistic housing need?
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 926
Received: 28/10/2023
Respondent: Mr Keith Clear
We should be looking to our own not allowing land in Medway to be developed by other authorities
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 951
Received: 29/10/2023
Respondent: Mr Norman Hogben
We are already overloaded with new developments of our own and cannot help Gravesend meet there needs.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 953
Received: 29/10/2023
Respondent: Mr Norman Hogben
Medway cannot accept Gravesend's housing needs when it has been put under so much pressure to to supply more of its own.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 988
Received: 29/10/2023
Respondent: Mr Leslie Brown
Gravesham have much larger Green Belt areas and some flexibility is required where the boundaries exist. There have been submissions on the boundary that have been rejected by Medway in the past. The areas will be re investigated by housing proposals in the area.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1073
Received: 30/10/2023
Respondent: Medway Green Party
Gravesham, like Medway, will be compelled to adopt unrealistic Housing targets. A local housing needs assessment for Gravesham will prove that a more realistic target is actually needed for a Borough that is currently less densely populated than Medway.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1129
Received: 30/10/2023
Respondent: Medway Council Climate Response Team
It is important that we say here that achieving Medway’s net zero carbon target is already challenging without adding in the forecasted level of housing required to meet population growth. This highlights the significant role the Local Plan has as a vehicle for achieving Medway’s net zero ambitions.
The Council will also need to assess the potential need to relocate communities which may be vulnerable to the impacts of climate change. If climate mitigation targets are not met, the number of displaced communities will likely increase putting further pressure on housing needs.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1160
Received: 30/10/2023
Respondent: St John's College
Agent: Savills (UK) Ltd
It would be useful to understand the approach or method Medway will be using to decide whether there is capacity to assist Gravesham with their housing need under the duty to cooperate. The earlier such information can be published in the public domain the better. This would aid transparency, promote early input and thus help minimise dispute on such matters at Examination.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1166
Received: 30/10/2023
Respondent: Mr Stuart Tranter
28,500 is already in excess of Medway's own needs and will be impossible to deliver within the plan period given past and current performance, so taking on more is a complete non-starter. Gravesham should plan for their own need within their borough.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1205
Received: 30/10/2023
Respondent: Mr Stephen Hesketh
I do not understand this request, but then I do not understand the recent influx of London residents, especially as Medway Council were unaware of this happening!
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1226
Received: 30/10/2023
Respondent: Railfuture Ltd
We take serious note of paragraphs 5.7 - 5.11 and observe that additional transport and especially public transport capacity will be required if Medway’s legitimate growth aspirations are not to be thwarted. While no panacea, we contend that additional rail capacity and necessary infrastructure must form a vital part of that equation.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1300
Received: 30/10/2023
Respondent: David Hopkins
Agree. It is important to consider that, in many ways, the Hoo Peninsula is more closely linked to Gravesham than to Chatham and Gillingham.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1352
Received: 31/10/2023
Respondent: Mrs Elizabeth Turpin
This will be challenging if it cannot be incorporated within our numbers. What requests have we made of our neighbouring boroughs? In particular Maidstone who have oversupplied their housing need.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1395
Received: 31/10/2023
Respondent: Mr R Castle
Agent: Bloomfields Ltd
It is identified in paragraph 5.11 that Medway are currently considering a request from Gravesham Borough Council (GBC) to increase capacity by 2000 homes to help meet the housing need of their district.
In March 2023 GBS produced its Five Year Housing Land Supply Statement, covering the period 2022-2027. This document sets out that Gravesham only has 2.9 years of deliverable housing supply. The new Local Plan for Gravesham is not expected until Dec2024.
The likelihood of Medway having to absorb some of this housing need should not be ignored in the early stages of Local Plan creation for Medway.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1435
Received: 31/10/2023
Respondent: AC Goatham & Son
Agent: Bloomfields Ltd
In March 2023 Gravesham Borough Council (GBC) produced its Five Year Housing Land Supply Statement, covering the period 2022-2027. This document sets out that Gravesham only has 2.9 years of deliverable housing supply. GBCs new Local Plan is not expected until December 2024, thus, their HLS is not likely to improve in the near future.
The high likelihood of Medway having to absorb some of this housing need should not be ignored in the early stages of Local Plan creation and the level of housing need should be set to reflect this.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1466
Received: 31/10/2023
Respondent: Mr Alexander Cameron
We should be enabling housing provision that meets the needs of Medway only. They cannot comment on external areas' needs but if also based on Government targets they may be inflated.
Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1480
Received: 31/10/2023
Respondent: Mr and Mrs R Goatham
Agent: Bloomfields Ltd
Paragraph 5.11 - Medway Council are currently considering a request from Gravesham Borough Council (GBC) to increase capacity by 2000 homes to help meet the housing need of their district.
GBC's Five-Year Housing Land Supply Statement (March 2023) sets out that Gravesham only has 2.9 years of deliverable housing supply. The new Local Plan for Gravesham is not expected until December 2024, therefore this situation is not likely to improve in the near future. The high likelihood of Medway having to absorb some of this housing need should not be ignored in the early stages of Local Plan creation.