Policy S22: Hoo Peninsula

Showing comments and forms 1 to 12 of 12

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 1847

Received: 22/07/2024

Respondent: Mrs Stella Tiller

Representation Summary:

Probably not the most popular opinion, but the Hoo Peninsula is probably the most suitably placed to take more development. It has already has a railway line that can be upgraded to provide a mainline London connection (although not to connect it to the rest of Medway would be ridiculous). It also can accommodate much more development than the rest of Medway, whilst still maintaining more greenfield than the rest of Medway. And unlike places like lower Rainham and Capstone Valley, it also capacity to take additional infrastructure such as new roads. It really needs local treatment centre though.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 2132

Received: 02/09/2024

Respondent: Mr James Wood

Representation Summary:

Existing centres should be developed, not new centres created, otherwise thsi will lead to a loss of character for the villages on the Peninsula.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 2760

Received: 06/09/2024

Respondent: CPRE Kent

Agent: Mr Richard Thompson

Representation Summary:

CPRE welcomes proposals to address existing deficiencies to meets the needs of existing local residents, but it cannot support the Council turning its back on these communities and siting such provision outside existing village centres (paragraph 8.2.1).

While addressing needs of existing residents is to be welcomed, this draft policy should not be seen as a green light accepting a development strategy which in its own right is unsustainable (in terms of identifying the Hoo Peninsula as an area of significant growth for housing).

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3041

Received: 06/09/2024

Respondent: St James, Isle of Grain, Parish Council

Representation Summary:

With the envisaged growth on the Hoo Peninsula, retail outlets are needed desperately. Medway Council should ensure that providers of residential developments should be made to incorporate this into their plans.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3094

Received: 07/09/2024

Respondent: St James, Isle of Grain, Parish Council

Representation Summary:

Will this policy protect the uniqueness of the Peninsula? Will its geography, geology, wildlife, agriculture etc. really be protected?

Please improve the roads but do not destroy the existing the existing landscape and villages.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3148

Received: 07/09/2024

Respondent: Mr Anthony Rees

Representation Summary:

Is any of that land being farmed?

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3214

Received: 07/09/2024

Respondent: Mr Roger Brown

Representation Summary:

It is manifest that the Hoo Peninsula has been asked to absorb a much greater number of the demanded new housing developments than other rural areas of Medway. This needs to be addressed urgently before the label Rural Wards becomes a misnomer.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3278

Received: 07/09/2024

Respondent: Miss Jackie Forrest

Representation Summary:

Less development required current infrastructure cant handle current population. Needs to be kept as rural village not a town

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3307

Received: 07/09/2024

Respondent: Mrs Yvonne Forrest

Representation Summary:

there has been no infrstucture on the hoo peninsula since the start of buliding there, it needs to be put in place first before anymore building takes place. new roads public transport health centres etc

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3601

Received: 08/09/2024

Respondent: Mr John Williams

Representation Summary:

Before any growth is allowed around the Hoo area sufficient and sustainable infrastructure and services must be
In place before any development goes ahead.
Existing business must be taken into account when any new facilities are planned and not be harmful to
Local establish village centre business ful consultation should had with local business and needs of local residents

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3885

Received: 08/09/2024

Respondent: Miss Rachael Selleck

Representation Summary:

I live in Allhallows and agree that we lack adequate infrastructure. Given this admission, it's perplexing why there are plans to build more houses here. The area’s current infrastructure is insufficient and unsustainable for additional development. Instead of focusing on more housing, the Hoo Peninsula urgently needs infrastructure investments to support the existing community. Prioritising improvements to infrastructure will ensure that any future developments are sustainable and genuinely beneficial to residents.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 4059

Received: 08/09/2024

Respondent: Mr Robert Wyatt

Representation Summary:

Fully agree