Policy T35: Provision of Additional Waste Management Capacity
Comment
Medway Local Plan (Regulation 18, 2024)
Representation ID: 3052
Received: 06/09/2024
Respondent: Mrs Helen Selleck
Allhallows is not suitable for lorries. The roads are of poor quality and are not large enough to accommodate such traffic
Comment
Medway Local Plan (Regulation 18, 2024)
Representation ID: 3235
Received: 07/09/2024
Respondent: Mr Anthony Rees
This isn't going to work and shouldn't be considered
Comment
Medway Local Plan (Regulation 18, 2024)
Representation ID: 3353
Received: 07/09/2024
Respondent: Mrs Yvonne Forrest
agree
Comment
Medway Local Plan (Regulation 18, 2024)
Representation ID: 3788
Received: 08/09/2024
Respondent: Mr John Williams
With the increased development in Medway we need to look at increasing our recycling facilities so that we can continue to
Run a Good waste management programme and to having a smooth and efficient upgrades where needed.
Comment
Medway Local Plan (Regulation 18, 2024)
Representation ID: 3842
Received: 08/09/2024
Respondent: Mrs Sue Bassett
Will developers be required to demonstrate sufficient capacity for waste management?
Comment
Medway Local Plan (Regulation 18, 2024)
Representation ID: 4090
Received: 08/09/2024
Respondent: Miss Rachael Selleck
In Allhallows, the sewage system is critically outdated and beyond its capacity, creating serious issues for local residents. The system's current state leads to frequent blockages and unpleasant odours, posing health risks and environmental concerns. With ongoing and planned developments, the strain on this inadequate infrastructure is set to worsen, amplifying existing problems. A drastic update to the sewage system is urgently needed to address these deficiencies, ensure proper waste management, and protect both public health and the local environment.