Policy T34: Safeguarding of Existing Waste Management Facilities

Showing comments and forms 1 to 6 of 6

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 2275

Received: 04/09/2024

Respondent: Southern Water

Representation Summary:

Southern Water operates wastewater treatment works within Medway. We request this wording addition:

In the case of new odour sensitive development, the agent of change principle applies to the new development and appropriate design and mitigation must be provided in the new development to ensure the ongoing viability of existing surrounding uses is not compromised. Developments in close proximity to existing uses which produce odour should provide an odour assessment in consultation with Southern Water to determine if any mitigating measures are required. If any measures are identified, the applicant must demonstrate how these have been included within the scheme.

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3233

Received: 07/09/2024

Respondent: Mr Anthony Rees

Representation Summary:

We do need the current sites around here and they serve well

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3351

Received: 07/09/2024

Respondent: Mrs Yvonne Forrest

Representation Summary:

agree

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3475

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan states at paragraph 12.4 that "the presumption is that existing consented waste management facilities are safeguarded from loss to non-waste uses, or from proximate development that may limit or hinder their operation". This is in direct contradiction to the impact of the Chatham Docks redevelopment proposals in the draft Local Plan, which would inevitably lead to the closure of the four waste management facilities shown on the draft Policy Map on the northern part of the Chatham Docks site.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 3935

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan states at paragraph 12.4 that "the presumption is that existing consented waste management facilities are safeguarded from loss to non-waste uses, or from proximate development that may limit or hinder their operation". This is in direct contradiction to the impact of the Chatham Docks redevelopment proposals in the draft Local Plan, which would inevitably lead to the closure of the four waste management facilities shown on the draft Policy Map on the northern part of the Chatham Docks site.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 4089

Received: 08/09/2024

Respondent: Miss Rachael Selleck

Representation Summary:

In Allhallows, the sewage system is beyond capacity, leading to significant problems for local residents. The overburdened system frequently results in unpleasant odours, potential health hazards, and environmental concerns. With the increased strain from existing and new developments, these issues are exacerbated, causing discomfort and frustration for residents. The inadequate sewage infrastructure not only impacts daily living conditions but also raises concerns about potential long-term damage to the environment and local amenities. It's crucial to address these capacity issues to ensure the well-being of the community and maintain a healthy living environment.