Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1228
Received: 30/10/2023
Respondent: Railfuture Ltd
Representation Summary:
We note that many of the more significant Urban Regeneration sites are not particularly conveniently located for ready access to Medway’s existing mainline rail stations, and will therefore be heavily dependent on a high quality public realm through which to walk and cycle to and from those stations and on high quality bus service links.