Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1513

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

It will be critical for supporting evidence base documents to interrogate the viability of delivering sites at the density suggested and to thoroughly test the estimated delivery timescales of sites within the trajectory based on the level of infrastructure provision required. The estimated delivery timescales for emerging allocations will need to factor in the speed with which strategic infrastructure works can be completed.
The viability of proposed allocations should also comprehensively address Medway's response to the loss of HIF funding for infrastructure improvement schemes, originally awarded to help deliver housing on the Hoo peninsular.