Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1607
Received: 31/10/2023
Respondent: Mr Roger Brown
Representation Summary:
Infrastructure is invariably setup in arrears. That should be the focus until “catch-up “ is achieved.
Representation ID: 1607
Received: 31/10/2023
Respondent: Mr Roger Brown
Infrastructure is invariably setup in arrears. That should be the focus until “catch-up “ is achieved.