Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 1748
Received: 31/10/2023
Respondent: Phillip Ivory
Representation Summary:
I support this approach. Infrastructure must be in place first, however the funding needs to be secured through the applications. You can only deliver infrastructure first for large scale schemes- will the council be proposing any?
High quality- quality engineering is prevalent in the construction industry due to non material amendments. We need to have policies that dictate a design code therefore providing planning officers with the ability to object on policy grounds to the lowering of quality/ design.