Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 1772

Received: 15/07/2024

Respondent: Mr Colin Harris

Representation Summary:

Better planning of works on transport links required to reduce the number of times areas become gridlocked or cut off by lengthy roadworks that are repeated only a week or so later. New roads should have provision for services tunnels to make access to services easier and less costly.