Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 1911

Received: 07/08/2024

Respondent: Peter Chatwell

Representation Summary:

I don't think the first two tests need to be quite as strict. If the current site is not in keeping with the desired economic mix (higher productivity) for Medway, then I do not think the site needs to also have been on the market for 12 months.