Comment

Medway Local Plan (Regulation 18, 2024)

Representation ID: 2106

Received: 30/08/2024

Respondent: Aggregate Industries UK Ltd

Representation Summary:

Our objection is in respect of policy T31 – safeguarding of existing minerals supply infrastructure. We consider the policy is not sound as it does not provide for the effective safeguarding of this critical infrastructure.

The policy as written imposes no obligation to provide replacement capacity for the safeguarded infrastructure that would be lost. This is in sharp contrast to policy T34 which provides a robust safeguarding policy for waste management facilities in Medway.

Therefore to ensure that the capacity is effectively safeguarded we believe that a double test, as provided in policy T34, is required.