Representation ID: 2646
Received: 06/09/2024
Respondent: CPRE Kent
Agent: Mr Richard Thompson
Need a true brownfield-first strategy.
Proactive approach is needed to save greenfield sites, including an Urban Capacity review and brownfield land specific call for sites.
Density needs to be maximised.
Active travel and public transport need provide a realistic alternative to car dependency.
Object to significant development on the Hoo Peninsula – an area with SSSIs, SACs SPAs and RAMSAR sites; BMV land and intrinsically dark skies. Ecology is extremely sensitive (nightingales and so on).
Object to building new roads to unlock greenfield sites, which will make ingrained car-dependency worse.
For the reasons set out in our earlier representations, it is clear to CPRE Kent that Medway’s new local plan should embrace a true “brownfield-first” spatial strategy. That is, before any greenfield land is released, far more needs to be done to demonstrate that brownfield opportunities have been maximised.
The Council know that those sites on its brownfield register are simply a list of sites already known to it, either as a consequence of a planning application or an existing local plan allocation. These add nothing in terms of identifying future additional supply.
It is also the case that very few brownfield sites will ever come forward as part of a call for sites exercise as these are usually in locations where the principle of development is already acceptable, meaning there is very little point in a landowner going through the unnecessary expense of promoting their site through the local plan process. Instead, the real profit is to be made from the promotion of greenfield sites, where the principle of development has not been agreed, hence why these naturally dominate any call for sites exercise as set out above.
A far more proactive approach needs to be undertaken. Key to this will be a full, detailed and up-to-date Urban Capacity review that robustly identifies where further development opportunities are within the urban areas.
Alongside this, we would want to see a brownfield land specific call for sites that is advertised as widely as possible. This should include local communities and the general public being actively encouraged to identify brownfield sites, with the Council working alongside to identify and overcome existing delivery constraints.
As an organisation we are happy to work proactively with the Council on this, utilising the CPRE Brownfield Land Register Toolkit which has been developed specifically for this purpose https://www.cpre.org.uk/resources/brownfield-land-register-toolkit/ . Likewise, we would welcome working with Medway Urban Greenspaces Forum to identify where there may be further opportunities for regeneration that’s welcomed by communities and developers alike.
With respect to delivery, it has always been our opinion the HIF Funding of £170 million being directed to releasing development on greenfield sites on the Hoo Peninsula was a massive, wasted opportunity. Instead, Medway Council should have been doing everything it could to get this funding re-directed so it could bring forward the various stalled brownfield sites within the Medway Urban Areas.
We are therefore extremely pleased to see that Medway received £3,968,371 from the first phase of the Department for Levelling Up, Housing and Communities Brownfield Land of £60 million to help release brownfield sites, including the Strood Waterfront and the Debenhams building in Chatham. With the second phase of monies also released and a total fund of £4.8 billion available, we would expect to see evidence of the Council having been fully engaged in securing the necessary funding to bring forward both the brownfield sites that have currently stalled and new sites identified.
We would also expect to see Medway’s leaders partnering with Homes England to bring forward identified brownfield sites and regenerating Medway’s high streets, where an increased residential offering will be anticipated. We would also expect to see evidence of the Council having fully engaged with all possible delivery partners before deciding that any sustainably located brownfield site is not deliverable.
CPRE Kent is calling on the new Plan to maximises the development potential (by density) of those sites located within the most sustainable areas. This needs to come hand in hand with good design, sufficient infrastructure and in particular sufficient active travel and public transport options that provide a realistic alternative to car dependency, along with sufficient well designed green spaces and inviting public realm environments. Higher density certainly does not have to come at the expense of good planning.
Overall, unless such proactive steps are undertaken, we are not going to accept the usual argument given to CPRE Kent that there are insufficient brownfield sites available for development, leaving no option but to allocate further greenfield land.
The higher the density, the more benefits accrue, and the more (greenfield) land is saved. High density building does not equate to high rise apartment blocks. CPRE London published a report in 2019 on this issue called ‘Double the density , halve the land needed’ which sets out both the benefits of higher density design along with providing examples of higher density developments being achieved by a variety of means. This includes a mixed-use residential development at Springhead Park, Ebbsfleet, Kent where 160dph is being achieved.
As set out above, we believe it is wrong to simply continue sacrificing yet more greenfield land in an attempt to accommodate what is an unsatisfiable external market demand. We would therefore firmly object to any further allocation upon the Hoo Peninsula beyond that accepted by the existing communities, as needed to maintain and support them.
This position is in recognition that the Hoo Peninsula is a largely rural area, containing significant environmental constraints including ancient woodlands, SSSI’s, SAC’s SPA’s and RAMSAR sites. It is also predominately Best and Most Versatile agricultural land and has significant areas of intrinsically dark skies, the loss of which should be strongly resisted. The ecology upon the Hoo Peninsula is extremely sensitive, containing one of the largest breeding sites in the UK for the nightingale population, highly protected water voles along with recently proven habitats of the rare purple emperor butterfly and dormouse. Medway also has at least six red listed rare birds sheltering in its boundaries including the Black Tailed Godwit, the Curlew and the Pochard and many more on the amber list. We note only last year, surveys on the Isle of Grain discovered the extremely rare Shrill Carder Bee only known to be found in seven areas across England and Wales and never before discovered in Kent.
It is also the fact that the Four Elms Hill and Peninsula Way through Chattenden suffers significant levels of air pollution, hence it being designated an Air Quality Management Area (AQMA). The proposed development associated with the £170 HIF funding bid largely sought to justify itself on the basis it was needed to help fund this new road infrastructure. With car ownership and usage rates on the Peninsula already much higher than the rest of Medway, our responses to the various HIF consultations strongly objected to the principle of the building yet more traffic inducing new roads that facilitate building, or “unlocking”, greenfield sites.
The benefits of new roads schemes are extremely over-stated and in reality, generate traffic above background trends by inducing traffic, which leads to permanent and significant environmental damage. Specifically, and as set out in our report ‘The end of the road? Challenging the road building consensus’, March 2017 https://www.cpre.org.uk/resources/transport/roads/item/4543-the-end-of-the-road-challenging-the-road-building-consensus, the building of new roads to accommodate further growth is just going to significantly exacerbate the Peninsula’s accepted existing problem with ingrained car dependency.
We remain unconvinced that the selection of the Hoo Peninsula for any substantial housing development beyond what is needed to support existing communities would survive the scrutiny of the Local Plan process. Focus must now be on mitigating the worst effects of the unplanned windfall development that has taken advantage of the HIF Funding debacle and are now coming forward without any plans for the necessary mitigation being put in place. As a minimum, Medway must be doing all it can to resist these developments as they continue to come forward. The first step to this will be making it as clear as possible, as early as possible, that Medway’s new local plan will not be looking to allocate any further significant development upon the Hoo Peninsula
For any allocations upon the Hoo Peninsula to be considered remotely acceptable by us, they would need to be demonstrably sustainable with very genuine levels of self-containment and deliverable sustainable transport options. This may include alternatives to the previously proposed rail station such as zero-emission dedicated bus routes that we are beginning to see elsewhere in Kent, such as Dover’s new Fasttrack service between Whitfield and Dover - https://www.dover.gov.uk/Planning/Regeneration/Fastrack/Dover-Fastrack.aspx.
In terms of the dispersed growth element of the blended strategy, CPRE Kent could support growth adjoining the existing urban areas to the south and east of Medway if it was demonstrated a true brownfield first approach had been undertaken, vital greenspaces were maintained and enhanced, and that sufficient infrastructure was to be provided. However, we are concerned that much of the area identified is Best and Most Versatile land. As set out within CPRE’s recent report “Building on our food security” in the past 12 years England has lost over 14,000 hectares of Grade 1 and 2 agricultural land to development, the equivalent to the productive loss of around 250,000 tonnes of vegetables. It also appears that this figure is increasing. Nationally there has been a 100-fold increase in 2022, from that built on in 2010. This loss cannot continue to be ignored. This issue will need to be given significantly more consideration with respect to the allocations which do make it to any submission version of the plan.
Specifically, we would want to see and understand what sequential measures have been undertaken to minimise loss of Best and Most Versatile land. We would also want to see how this significant constraint has been given the due regard necessary with both the setting of an appropriate housing figure for Medway and then the site selection process, informing which sites are taken forward to allocation. It is however our starting assumption that any loss of BMV could be avoided.
Where sites on the urban edge are to come forward, we would want to see that sufficient active travel and public transport options that provide a realistic alternative to car dependency are provided. We would also want to see that existing green spaces are sufficient protected and improved/expanded to accommodate an increasing population. Where new land is given over to development, it should be used as efficiently as possible, as appropriate for that site’s location.