Support
Medway Local Plan (Regulation 19, 2025)
Representation ID: 4375
Received: 18/07/2025
Respondent: Mr Graham Hunt
Representation Summary:
A travel plan for Medway is long overdue and desperately needed to address current issues, like the bottlenecks throughout the towns, problems in Rainham when the M2 is closed or Operation Brook causes overspill to the A2 etc.
The A2 needs upgrading through much of the towns to resemble the trunk route it needs to be throughout it's entire length.