Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 497

Received: 19/10/2023

Respondent: Mr Keith Swaden

Representation Summary:

As the HIF funding has been withdrawn, the chance of key infrastructure projects being delivered by the timeline required to deliver this plan has already been lost. The consequence of this will be houses being built years before the required infrastructure is in place to support the increased population, further congesting already congested road systems.