Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 620
Received: 25/10/2023
Respondent: Mrs Daniela Baylis
Representation Summary:
this is too high and needs recalculation. Any development site granted planning permission should have to be built within the plan period or lose the planning permission. Requirements for household submissions are that planning lapses if work is not started within 3 years, this should be extended to all planning permissions granted.