Comment
Medway Local Plan (Regulation 18, 2023)
Representation ID: 984
Received: 29/10/2023
Respondent: Mr Leslie Brown
Representation Summary:
Having worked on the M2 widening project for 9 years, now built Junction 1 had a 2 lane off slip Londonbouond. It was reduced to a one lane slip. Possibly due to accidents. It can be changed with funding. Junction 3 has an inadequate 1 lane come 2 lane right turn, off slip coastbound to Maidstone. It may retaining walls but it can be increased. MOVA control may be better at controlling capacity. The Blue bell Hill off slip directly via Buckmore onto the M2 has had its funding cancelled. When the M2 widening was undertaken the cost benefit killed