14.7.5
Object
Medway Local Plan (Regulation 19, 2025)
Representation ID: 4658
Received: 08/08/2025
Respondent: Mr Kevin Smith
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Imbalance of infrastructure to the Gravesham area, and dependance on Gravesham.
Prioritisation of infrastructure to mitigate risk of developer failure.
Existing high risk pipeline.
Object
Medway Local Plan (Regulation 19, 2025)
Representation ID: 4819
Received: 10/08/2025
Respondent: Mrs Alison Stiling
Legally compliant? No
Sound? No
Duty to co-operate? No
Gravesend does not close there consultation until after medway has closed. So how this is already decided is worrying
Object
Medway Local Plan (Regulation 19, 2025)
Representation ID: 4820
Received: 10/08/2025
Respondent: Mrs Hazel Wiggins
Legally compliant? No
Sound? No
Duty to co-operate? No
Gravesham Council do not close their consultation until after Medway has closed there's .