14.7.5

Showing comments and forms 1 to 3 of 3

Object

Medway Local Plan (Regulation 19, 2025)

Representation ID: 4658

Received: 08/08/2025

Respondent: Mr Kevin Smith

Legally compliant? Yes

Sound? No

Duty to co-operate? Yes

Representation Summary:

Imbalance of infrastructure to the Gravesham area, and dependance on Gravesham.
Prioritisation of infrastructure to mitigate risk of developer failure.
Existing high risk pipeline.

Object

Medway Local Plan (Regulation 19, 2025)

Representation ID: 4819

Received: 10/08/2025

Respondent: Mrs Alison Stiling

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Gravesend does not close there consultation until after medway has closed. So how this is already decided is worrying

Object

Medway Local Plan (Regulation 19, 2025)

Representation ID: 4820

Received: 10/08/2025

Respondent: Mrs Hazel Wiggins

Legally compliant? No

Sound? No

Duty to co-operate? No

Representation Summary:

Gravesham Council do not close their consultation until after Medway has closed there's .