Object
Medway Local Plan (Regulation 19, 2025)
Representation ID: 4658
Received: 08/08/2025
Respondent: Mr Kevin Smith
Legally compliant? Yes
Sound? No
Duty to co-operate? Yes
Representation Summary:
Imbalance of infrastructure to the Gravesham area, and dependance on Gravesham.
Prioritisation of infrastructure to mitigate risk of developer failure.
Existing high risk pipeline.