5.15

Showing comments and forms 1 to 19 of 19

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 381

Received: 02/10/2023

Respondent: Mr Nicholas Dowling

Representation Summary:

All proposed development should be sustainably located adjacent to existing and new public transport hubs

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 423

Received: 06/10/2023

Respondent: Mrs Jill Norton

Representation Summary:

The council should always be clear and transparent about the outcomes from the Strategic Assessments and as a matter of course openly share the documents and assessments leading to their decisions. History has shown there has been an absolute unwillingness to do this especially in terms of the proposed development of circa 800 homes at High Halstow. Be honourable going forward. Give residents confidence in your commitment to protect us.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 567

Received: 24/10/2023

Respondent: Terance Butler Holdings

Representation Summary:

Sufficient sites/land must be allocated in sustainable locations, focussing on urban areas and brownfield land to achieve future growth requirements and housing needs and provide for a range of sizes, types and affordability. Planning applications for development proposals need to be viewed proactively and positively and determined expeditiously to provide developers with confidence to invest and deliver the range of accommodation that is required for the future growth of Medway. Viability of development proposals, notably on brownfield land, will need to be a material consideration and a flexible approach needs to be adopted by the Council when determining such proposals.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 622

Received: 25/10/2023

Respondent: Mrs Daniela Baylis

Representation Summary:

coalescence of settlements should be avoided. The A228 is a long corridor of developments that is eroding the distinction between Halling and Cuxton. Any further development in these villages should be avoided.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 795

Received: 27/10/2023

Respondent: AC Goatham & Son

Agent: Bloomfields Ltd

Representation Summary:

It is noted in paragraph 5.15 that the LAA have identified land with the potential capacity
for c 38,200 homes. These sites will be taken forward to the next stage of detailed site
assessment. It is important that these sites are not discounted early-on before any final
housing numbers are decided.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 867

Received: 28/10/2023

Respondent: Mr Keith Harrison

Representation Summary:

We need to avoid too many expensive new dwellings at the expense of local residents' needs.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 993

Received: 29/10/2023

Respondent: Mr Leslie Brown

Representation Summary:

Development along Rochester Riverside has taken some time to build out. Many riverside footway/cycle links remain closed as a result. The reclamation of land providing opportunities' that needs to be built out much sooner than later. However developers can only sell up to 50 dwellings per year to make it financial viable. The site should be split for more developers to purchase then to build out.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1078

Received: 30/10/2023

Respondent: Medway Green Party

Representation Summary:

Current housing development appears to be targeted at wealthy inward migration and this seems set to continue at the expense of local residents and local democracy. Please note sub-standard, poorly designed houses at Cliffe Woods selling for £800,000.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1118

Received: 30/10/2023

Respondent: Brunel Planning

Representation Summary:

ArcelorMittal submitted representations to the Call for Sites consultation requesting that Chatham Docks be retained as a working, vibrant dock and be promoted for development for continued port use in line with current Local Plan policies ED1 and E9.

Housebuilding and transformation of waterfront areas cannot be to the detriment of existing, viable employment generating sites such as Chatham Docks.

Evidence submitted to the Council on behalf of ArcelorMittal confirms that Chatham Docks is viable and has an important and significant role in Medway and the South-East employing many local people.

See full representations sent by email.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1242

Received: 30/10/2023

Respondent: Mr Andrew Warrilow

Representation Summary:

There is no infrastructure to support this level of development. Health, Education, Roads - these are all at capacity and are already unable to support the existing population within Medway. To take steps, through significant levels of housebuilding, to significantly increase the population further will only make this worse. Your projections on population increase are flawed as they are self fulfilling - if you build more houses, people will move into the area - and will be unable to be supported by the lack of infrastructure. Infrastructure first for the people who already live in Medway.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1310

Received: 31/10/2023

Respondent: Mr Tom Goodyear

Representation Summary:

Currently included in the maps are areas which are not suitable for development. For example North Dane Wood on Lordswood Lane is marked in the East Hill applications as being ancient woodland but has been put forward for development. The same land owners have also used this woodland in their East Hill development as forming a neighbouring green route for wildlife to support their development. This cannot work both ways and given East Hill has approval, this woodland must remain. Also included are Hempstead Road allotments which are also vital. I therefore have concerns that due diligence hasn't taken place.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1331

Received: 31/10/2023

Respondent: Eutopia Homes

Representation Summary:

Stage 2 of the LAA is underway and involves estimating development potential of identified sites. It's critical that this should not be an exercise of applying an arbitrary / capped density per hectare thresholds for relevant sites. Such an approach would fail to optimise the use of sites which can evidently deliver high density development in accessible locations.

Applying density thresholds on identified ‘Urban Regeneration’ sites restricts the most efficient and effective use of suitable, available, and achievable sites (key criteria for Stage 2 of the LAA) without giving full consideration to its development potential through the development management process.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1397

Received: 31/10/2023

Respondent: Mr R Castle

Agent: Bloomfields Ltd

Representation Summary:

It is noted in paragraph 5.15 that the LAA have identified land with the potential capacity for c 38,200 homes. These sites will be taken forward to the next stage of detailed site assessment. It is important that these sites are not discounted early-on before any final housing numbers are decided.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1487

Received: 31/10/2023

Respondent: Mr Alexander Cameron

Representation Summary:

Suggest this work is reduced in scope as it's not about meeting our actual needs for housing which are more modest than external imposed targets. A top level assessment should allow the LAA to be filtered down to a realistic level. Lets not waste money on this.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1504

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough is of the view that the identified needs can only be met if development is allocated across a range of areas, including those where development is most viable and not solely focusing on the Hoo peninsula and urban locations. Richborough is also of the view that rigorous viability work needs to be provided that tests all modified development management policies, including changes to Building Regulations and likely changes to the NPPF, so as to clearly evidence that they do not result in onerous requirements that would prohibit much needed sustainable development being brought forward.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1528

Received: 31/10/2023

Respondent: Mrs Marilyn Stone

Representation Summary:

Why are we meeting the needs of Londoners on good salaries. I think they themselves would prefer to reduce their commute and stay living in London if their housing needs were met there!

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1577

Received: 31/10/2023

Respondent: RSPB England

Representation Summary:

The RSPB believes this is an opportunity to reassess development needs and options and to ensure development is located in the most sustainable locations, to establish a sustainable long term strategy. We welcome the steps the Council has taken to reassess potential development sites via the Stage 1 Land Availability Assessment, the broad results of which are presented in the draft local plan consultation. A Sustainability Appraisal (SA) of these sites must be undertaken (individually and cumulatively) so as to properly understand the relative impacts of new development in the broad locations shown, with an evidence base for site allocation.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1581

Received: 31/10/2023

Respondent: Mr Graham Crawford

Representation Summary:

My word the mitigation needed would be phenomenal perhaps unachievable.

Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 1664

Received: 31/10/2023

Respondent: Mr Roger Brown

Representation Summary:

I don’t accept the scale of the plan to be necessary. If this aspect is accepted then it becomes acceptable like so many of the ecological disasters which are now enveloping our ecosystem.