Medway Local Plan (Regulation 18, 2023)

Search representations

Results for Richborough search

New search New search

Comment

Medway Local Plan (Regulation 18, 2023)

5.26

Representation ID: 1501

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough agrees with the assertion that sites in the urban core area are likely to have greater viability constraints due to costs associated with demolition and site remediation as well as the usual obligations relating to the provision of affordable housing and infrastructure requirements. Too much reliance on urban sites in the Local Plan trajectory should be avoided, as much needed housing may be slow to be delivered.
The Stage 2 Assessment will clearly need to rigorously assess the urban sites given the breadth of constraints in respect of suitability, availability and viability concerns.

Comment

Medway Local Plan (Regulation 18, 2023)

5.25

Representation ID: 1502

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough acknowledges the reference to the requirement for new development to be sensitive to the designated historic features in the urban area of Chatham. It is critical to the protection of the local historic character that new development is of a high quality and sensitively designed to complement the historic features in situ. The holistic development of the urban area will be critical to achieving this and will inevitably impact on the lead in times and delivery rates of new dwellings within this area.

Comment

Medway Local Plan (Regulation 18, 2023)

5.15

Representation ID: 1504

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough is of the view that the identified needs can only be met if development is allocated across a range of areas, including those where development is most viable and not solely focusing on the Hoo peninsula and urban locations. Richborough is also of the view that rigorous viability work needs to be provided that tests all modified development management policies, including changes to Building Regulations and likely changes to the NPPF, so as to clearly evidence that they do not result in onerous requirements that would prohibit much needed sustainable development being brought forward.

Comment

Medway Local Plan (Regulation 18, 2023)

5.13

Representation ID: 1505

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough is of the view that the supply resilience buffer should be at least 10%, and potentially as high as 15%.
Richborough is therefore of the view that Medway Council should allocate additional sites and reserve sites in the Plan that could be released if monitoring continued to show under delivery. Richborough is of the view that the monitoring policy should clearly establish that if monitoring shows that the Plan is not delivering housing as required, then Medway will grant permissions for additional housing; release reserve sites; and undertake other actions to help bring schemes forward, in that order.

Comment

Medway Local Plan (Regulation 18, 2023)

5.11

Representation ID: 1509

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough is of the view that it is imperative that Medway Council undertake discussions with neighbouring authorities at the earliest possible stage. This is particularly the case with Gravesham given the extent of Green Belt within the Borough.
Richborough expects further information to be published in this respect as discussions with neighbouring authorities continue, although it is prudent at this early stage of Local Plan preparation to accommodate and make allowances for the potential 2,000 additional homes that may be required to meet Gravesham’s needs.

Comment

Medway Local Plan (Regulation 18, 2023)

5.10

Representation ID: 1510

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

The ability to deliver significant levels of residential development sustainably alongside ecological designations will need to be evidenced. Richborough is of the view that the second stage of the Land Availability Assessment (LAA) will need to assess how the residential development of each site can viably protect against the erosion of these features and Medway Council should look to develop a site selection methodology which prioritises sites which minimise impact on these key ecological designations.

Comment

Medway Local Plan (Regulation 18, 2023)

5.7

Representation ID: 1512

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Paragraph 5.7 references highway network constraints, including those associated with the Strategic Road Network (SRN), particularly M2 Junction 1.
Richborough consider that the issues raised by National Highways do not preclude appropriately located and planned growth across the north of the borough, and support the prioritised action by Medway Council, working alongside neighbouring authorities and wider stakeholders, to deliver appropriate mitigation. Such mitigation being likely to include both physical infrastructure improvements, as well as ensuring that proposed allocations can facilitate a reduction in the need to travel by private car, in line with DfT Circular 01-2022.

Comment

Medway Local Plan (Regulation 18, 2023)

5.6

Representation ID: 1513

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

It will be critical for supporting evidence base documents to interrogate the viability of delivering sites at the density suggested and to thoroughly test the estimated delivery timescales of sites within the trajectory based on the level of infrastructure provision required. The estimated delivery timescales for emerging allocations will need to factor in the speed with which strategic infrastructure works can be completed.
The viability of proposed allocations should also comprehensively address Medway's response to the loss of HIF funding for infrastructure improvement schemes, originally awarded to help deliver housing on the Hoo peninsular.

Comment

Medway Local Plan (Regulation 18, 2023)

5.4

Representation ID: 1514

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

The affordability ratio and Local Plan evidence base highlight significant issues with regard to affordability of dwellings in Medway. The cumulative deficit in affordable housing over the 19 year period (2003-2021) is 10,012. The emerging Local Plan housing requirement clearly needs to reflect both the worsening affordability and the previous poor housing delivery rates. These factors point to the need for a significant increase in the number of houses to be planned for.

Comment

Medway Local Plan (Regulation 18, 2023)

5.3

Representation ID: 1515

Received: 31/10/2023

Respondent: Richborough

Agent: Pinnacle Planning

Representation Summary:

Richborough supports the use of the Standard Method figure for calculating local housing need and forming the basis for determining the housing requirement for the Local Plan. However, it is important to recognise that the need figure generated by the standard methodology should be considered as the minimum starting point in establishing a requirement for the purposes of plan production.
Richborough is of the view that the Plan should look ahead to at least 2040/2041 in order to ensure that the Plan meets the requirements of NPPF paragraph 22.

Please read the help guide if you are using this consultation platform for the first time.