Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 463

Received: 16/10/2023

Respondent: Mr Robert French

Representation Summary:

Any development within Capstone/Hempstead will mean traffic for the M2 will have to go through Hempstead an already built up area with roads not designed for large volumes of traffic. Alterations to Junction 4 will not alter the fact all traffic wishing to join the M2 will have to go through Hempstead to join the A 278 to access the M2.