Comment

Medway Local Plan (Regulation 18, 2023)

Representation ID: 729

Received: 26/10/2023

Respondent: Mr Alan Stockey

Representation Summary:

As a result of crippling rents the existing HLC in Rainham is underutilised. Intervention is required to ensure that S106 and CIL are used to enhance existing capacities. Significant challenge has been raised in Rainham but nobody appears to have the wit or appetite to resolve. Maximising capacity of existing facilities should feature highly in the plan, but it doesn’t get a mention.