Medway Local Plan (Regulation 18, 2024)

Search representations

Results for ArcelorMittal Kent Wire Limited search

New search New search

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S11: Existing Employment Provision

Representation ID: 3470

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Policy S11 is wholly inconsistent with the proposals for Chatham Docks. Chatham Docks would not meet the proposed test for non-employment redevelopment as it is neither no longer appropriate or viable nor has there been no market interest in the in the site, nor has been market for a reasonable period (of 12 months). This demonstrates again the lack of consistency within the draft Local Plan, and the failure to properly consider of the redevelopment of Chatham Docks and its wider consequences. It is not considered in the sustainability appraisal.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S14: Supporting Medway's culture and creative industries

Representation ID: 3471

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

There are superficial references to the use of waterfront sites for regeneration and tourism, without proper consideration of the unique locational characteristics of Chatham Docks pursuant to emerging NPPF 84(b) and 85. The policy does not consider the significance of the non-tidal docks and business who need to locate there, and the carbon impact of losing water-based transport facilities. There does not appear to be any more detailed assessment than an assumption that cultural facilities near water would be visually attractive. The sustainability appraisal does not grapple with it.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Vision for Access and Movement in Medway

Representation ID: 3472

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan is not "leading with a vision" in pursuit of net zero when considering the proposals for the Chatham Docks site. It is inconsistent when proposing land uses at the Docks which do not require access to the water and would not make use of water-transport, and forcing existing businesses which use water-based transport for bulky industrial products to relocate. The draft Local Plan has failed to grapple with the importance in transport and carbon terms (in particular NPPF paragraph 8), among others, when proposing residential redevelopment.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy T21: Riverside Infrastructure

Representation ID: 3473

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

ArcelorMittal Kent Wire support this policy and note it is in conflict with the proposals for Chatham Docks. In the event Chatham Docks was redeveloped for residential use, we consider it highly likely that the dock gates would be fixed shut and riverside infrastructure would be lost, in direct contravention of this draft policy. We understand that as well as the current occupiers the Royal Navy also have the ability to access Pool 2 via Chatham Docks, which would be prevented if the lock gates were fixed shut.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S24: Infrastructure Delivery

Representation ID: 3474

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan fails to protect infrastructure assets at Chatham Docks as the proposed residential redevelopment will lead to the loss of a non-tidal dock, a key and unique infrastructure asset. Further, there is no consideration of the loss of the ArcelorMittal Kent Wire facility as a result of the proposed redevelopment of their site, and the impact that will have on region wide infrastructure projects where the steel products required are no longer produced locally and may be less available, need to travel long distances, and be at greater cost.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy T34: Safeguarding of Existing Waste Management Facilities

Representation ID: 3475

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan states at paragraph 12.4 that "the presumption is that existing consented waste management facilities are safeguarded from loss to non-waste uses, or from proximate development that may limit or hinder their operation". This is in direct contradiction to the impact of the Chatham Docks redevelopment proposals in the draft Local Plan, which would inevitably lead to the closure of the four waste management facilities shown on the draft Policy Map on the northern part of the Chatham Docks site.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Vision for Medway in 2041

Representation ID: 3476

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan states in its strategic objectives that growth will be directed to the most suitable locations. We submit the strategic objective itself is too vague to serve its purpose – it is unclear what it would or would not justify and is not a proper basis for alternative testing or assessment of soundness. Further, in relation to employment, critical economic infrastructure, and lack of proper alternative testing, the strategy would not put the growth in the most sustainable places. There are a number of inconsistencies with the NPPF, detailed further in the full representation provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Vision for Medway in 2041

Representation ID: 3905

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan states in its strategic objectives that growth will be directed to the most suitable locations. We submit the strategic objective itself is too vague to serve its purpose – it is unclear what it would or would not justify and is not a proper basis for alternative testing or assessment of soundness. Further, in relation to employment, critical economic infrastructure, and lack of proper alternative testing, the strategy would not put the growth in the most sustainable places. There are a number of inconsistencies with the NPPF, detailed further in the full representation provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Prepared for a sustainable and green future

Representation ID: 3908

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Chatham Docks utilities river-borne and sea-borne transport to receive raw materials and to send out finished products, a lower carbon alternative to road-based transport. If Chatham Docks is redeveloped as a residential led development, ArcelorMittal Kent Wire will be forced to relocate, likely outside the UK, leading to longer journeys for their steel products essential for UK construction projects, including those associated with sustainable energy development.

The carbon impact of this has not been properly considered by as part of the draft Local Plan process.

A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Supporting people to lead healthy lives and strengthening our communities

Representation ID: 3910

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Chatham Docks is a 400-year old commercial port and a vibrant, working dock operating 24 hours a day, seven days a week. The docks employ over 800 people – many of whom are local. There are also existing jobs in the supply chains. There are over 2000 jobs dependent on the docks.

Chatham Docks must be both supported and protected in the new Local Plan. The new Local Plan must strike a balance in identifying new sites for housing but not to the detriment of existing jobs and existing important employment generating uses.

A full representation is provided to planning.policy@medway.gov.uk

Please read the help guide if you are using this consultation platform for the first time.