Medway Local Plan (Regulation 18, 2024)

Search representations

Results for ArcelorMittal Kent Wire Limited search

New search New search

Comment

Medway Local Plan (Regulation 18, 2024)

Policy T21: Riverside Infrastructure

Representation ID: 3933

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

ArcelorMittal Kent Wire support this policy and note it is in conflict with the proposals for Chatham Docks. In the event Chatham Docks was redeveloped for residential use, we consider it highly likely that the dock gates would be fixed shut and riverside infrastructure would be lost, in direct contravention of this draft policy. We understand that as well as the current occupiers the Royal Navy also have the ability to access Pool 2 via Chatham Docks, which would be prevented if the lock gates were fixed shut.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S24: Infrastructure Delivery

Representation ID: 3934

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan fails to protect infrastructure assets at Chatham Docks as the proposed residential redevelopment will lead to the loss of a non-tidal dock, a key and unique infrastructure asset. Further, there is no consideration of the loss of the ArcelorMittal Kent Wire facility as a result of the proposed redevelopment of their site, and the impact that will have on region wide infrastructure projects where the steel products required are no longer produced locally and may be less available, need to travel long distances, and be at greater cost.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy T34: Safeguarding of Existing Waste Management Facilities

Representation ID: 3935

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan states at paragraph 12.4 that "the presumption is that existing consented waste management facilities are safeguarded from loss to non-waste uses, or from proximate development that may limit or hinder their operation". This is in direct contradiction to the impact of the Chatham Docks redevelopment proposals in the draft Local Plan, which would inevitably lead to the closure of the four waste management facilities shown on the draft Policy Map on the northern part of the Chatham Docks site.
A full representation is provided to planning.policy@medway.gov.uk

Please read the help guide if you are using this consultation platform for the first time.