Medway Local Plan (Regulation 18, 2024)

Search representations

Results for ArcelorMittal Kent Wire Limited search

New search New search

Comment

Medway Local Plan (Regulation 18, 2024)

Securing jobs and developing skills for a competitive economy

Representation ID: 3914

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

ArcelorMittal strongly supports the Council’s Strategic Objectives to secure jobs and develop skills for a competitive economy – these objectives must be carried forward in continuing to protect Chatham Docks in the new Local Plan.
The current Local Plan protects existing employment uses and ‘port-related development.
If the Council is truly seeking to ‘boost the performance of the local economy by supporting local businesses to grow and innovate…’ and ‘build on existing strengths and expertise, such as engineering…and raise the profile of key sectors…’ then these protections must remain.’
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Boost pride in Medway through quality and resilient development

Representation ID: 3915

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

There is no proper assessment of the proposed loss of the ArcelorMittal Kent Wire facility versus the residential led proposal to ascertain whether what is proposed is a quality and resilient development. The lack of proper assessment prevents evidence-based judgments being made.
Given the significance of the port and its unique features as a non-tidal dock within Medway and the South-East, we consider there must continue to be a policy within the Local Plan which specifically supports the docks and its uses. We submit an alternative proposal for the Docks, the SPPARC Masterplan, alongside our full representations to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Spatial Development Strategy

Representation ID: 3917

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Neither the draft Local Plan nor supporting documents provide any reasoned conclusions for the redevelopment of Chatham Docks away from strategically significant steel manufacturing. There is no indication that the Council have considered the spatial and location uniqueness of the last non tidal dock in the South East, nor the consequences of redeveloping them as homes. It does not consider the impact on the UK construction industry, carbon impacts of losing water based transport, loss of 2000 skilled jobs and inadequately considers economic impact, employment land, and the unique features of the docks.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

3.2.1

Representation ID: 3918

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

There is no assessment of the proposal for the residential led redevelopment of Chatham Docks. The Chatham Docks Employment Report considers the economic impact of a mixed-use redevelopment of Chatham Docks but in a superficial way without proper consideration of the loss of UK production of essential steel products. The issue is not adequately considered by the Sustainability Appraisal. Noting the very widely drawn strategic objective, the Council has so far failed to produce (or rely on) any evidence which properly appraises the proposed redevelopment.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S1: Planning for Climate Change

Representation ID: 3920

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Chatham Docks, by virtue of its location on a non-tidal dock, is able to use water-based transport. Were the site to be redeveloped for residential led development in accordance with the draft Local Plan, the new occupiers would not make use of that water-based transport. AMKW have sought to identify alternative sites but have concluded they would likely need to relocate outside the UK. This would have carbon consequences, as materials would need to be transported longer distances, and likely with more reliance on road-based transport.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S5: Securing Strong Green and Blue Infrastructure

Representation ID: 3922

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Chatham Docks is vital to maintaining a ‘robust…blue infrastructure network…’
The river-borne and sea-borne traffic associated with Chatham Docks allows direct sustainable connections with the rest of the South-East and with European ports, rather than just lorry deliveries in and out. These options would be lost were Chatham Docks to be redeveloped for uses not requiring water-based transport, and with displaced industry instead relying more on road-based transport with consequent carbon impact.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S10: Economic Strategy

Representation ID: 3925

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The Local Plan puts forward policies in relation to employment land needs, whilst acknowledging that it is based on an assessment from 2015, updated in 2020. We submit that a more up to date assessment is required to accurately consider the need for employment land. The information provided to date is an insufficient basis for the Council's apparent identified need to "regenerate" Basin 3. We do not consider that a need to "regenerate" the site has been identified, especially given that it is currently occupied by a viable key employer.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S11: Existing Employment Provision

Representation ID: 3926

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

Policy S11 is wholly inconsistent with the proposals for Chatham Docks. Chatham Docks would not meet the proposed test for non-employment redevelopment as it is neither no longer appropriate or viable nor has there been no market interest in the in the site, nor has been market for a reasonable period (of 12 months). This demonstrates again the lack of consistency within the draft Local Plan, and the failure to properly consider of the redevelopment of Chatham Docks and its wider consequences. It is not considered in the sustainability appraisal.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Policy S14: Supporting Medway's culture and creative industries

Representation ID: 3929

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

There are superficial references to the use of waterfront sites for regeneration and tourism, without proper consideration of the unique locational characteristics of Chatham Docks pursuant to emerging NPPF 84(b) and 85. The policy does not consider the significance of the non-tidal docks and business who need to locate there, and the carbon impact of losing water-based transport facilities. There does not appear to be any more detailed assessment than an assumption that cultural facilities near water would be visually attractive. The sustainability appraisal does not grapple with it.
A full representation is provided to planning.policy@medway.gov.uk

Comment

Medway Local Plan (Regulation 18, 2024)

Vision for Access and Movement in Medway

Representation ID: 3930

Received: 08/09/2024

Respondent: ArcelorMittal Kent Wire Limited

Agent: Lucy McDonnell

Representation Summary:

The draft Local Plan is not "leading with a vision" in pursuit of net zero when considering the proposals for the Chatham Docks site. It is inconsistent when proposing land uses at the Docks which do not require access to the water and would not make use of water-transport, and forcing existing businesses which use water-based transport for bulky industrial products to relocate. The draft Local Plan has failed to grapple with the importance in transport and carbon terms (in particular NPPF paragraph 8), among others, when proposing residential redevelopment.
A full representation is provided to planning.policy@medway.gov.uk

Please read the help guide if you are using this consultation platform for the first time.